Your new floor is only as good as what's underneath it. Here's how we check yours, what levelling might cost, and why it's worth getting right.
We'll know for sure once the old floor is up. We check it with a 10 ft straightedge and tell you the exact bag count before we pour a single bag.
It's nobody's fault. It's how houses are built and how they age. A new hard floor will feel every hump and dip underneath it.
Floor joists slowly bend under years of weight, and part of that bend stays. Long spans sag the most.
New lumber keeps drying and shrinking for years, mostly in the joists. Homes closed in while the wood was still wet move the most.
Foundations settle, and concrete slabs can curl as they dry, lifting at the edges.
Many homes spent years under carpet and pad, which hide humps and dips. Lift it and a hard floor finds every one.
Subfloor panels that got rained on during the build can swell at the edges and leave ridges along the seams.
Old glue, patches and past repairs leave high spots behind.
Over 10 feet. That's what most flooring makers require under a floating floor (or 1/8" over 6 ft). Roughly two and a half loonies stacked up.
A rigid plank can't follow a dip โ it bridges over it. That empty space underneath is where problems start.
Dip depth exaggerated on screen for clarity.
A floating floor isn't fastened down. It rests on whatever is under it, so the flatter the base, the more solid and quiet the floor.
No bounce or hollow spots, the things that make a brand-new floor feel cheap.
No clicking or popping from planks flexing into low spots with every step.
Flexing over dips wears out the click locks. Over a flat base they stay closed for years.
A loaded fridge and heavy cabinets press down on every dip underneath a floating floor.
One spot might need half an inch, and right beside it almost nothing. Some floors need no levelling, many just a few bags at the worst spots, and some need it across the whole floor.
Depths exaggerated on screen for clarity.
Confirmed on site. Once the old floor is up, we map it with a 10 ft straightedge and tell you the count before we pour.
Per bag, supplied and installed. We pour MAPEI Novoplan 2 Plus, a professional-grade self-leveller that flows out flat. Cheaper ones can start to set before they've finished levelling.
Pro-grade MAPEI materialNot a hardware-store substitute
PrimerRequired for proper bond โ skip it and the pour can delaminate
Surface prepScraping, cleaning, vacuuming and sealing gaps
Measured mixingExact water ratio, high-speed drill and paddle โ every bag
Skilled pouringA short working window. It has to be right the first time
Check, cleanup & disposalStraightedge-verified, site left clean
Questions about your floor? We're happy to walk you through it.
Every install is backed by our 10-year workmanship guarantee.