The Honest Floor Guide › Installation

Floors, Cabinets or Paint First? The Renovation Order That Saves Headaches

The right order for a kitchen or whole-home renovation. Why cabinets should never sit on a floating floor, why base cabinets go in first with gables after, and why kitchens are the most critical room for flatness.

BRBrody Rose · Owner, Rose and Thorn Flooring · 12 years in flooring
Updated November 10, 2026 · 5 min read
The short version
  • Paint first (at least primer and first coats), floors after, touch-ups last.
  • Never install cabinets on top of a floating floor. It pins the floor and stops it moving.
  • With a floating floor, base cabinets go in first, then the floor, then the finishing gables and end panels.
  • Kitchens are the most critical area for flatness. Fridge and cabinet weight magnifies any hump or dip.
  • Baseboards go on after the floor.

Renovation order sounds like a scheduling detail. It isn't. Get it wrong in a kitchen and you can end up with a floor that's pinned in place, a dishwasher that won't come out, or a cabinet run that rocks. Here's the order we plan around, and why.

A typical order

  1. Demolition, structure, plumbing and electrical.
  2. Drywall and mud (it's wet and dusty, so keep flooring away).
  3. Prime and paint walls and ceilings.
  4. Subfloor checks and levelling, especially in the kitchen.
  5. Base cabinets and islands (when the floor is floating).
  6. Flooring.
  7. Finishing gables, end panels and toe kicks.
  8. Baseboards, trim and transitions. Trim guide
  9. Appliances (slide in on protection).
  10. Final paint touch-ups.

Every job is a little different, but the logic stays the same: wet and messy trades first, the floor once the room is mostly closed in, and anything that sits on or against the floor after it.

Never put cabinets on a floating floor

Floating floors (most click vinyl plank and laminate) aren't fastened down. They need to expand and contract with the seasons. Set a run of cabinets or a heavy island on top and you pin the floor in place. When it tries to move, it can peak, gap or separate somewhere else in the room.

It also causes trouble later. If a plank under a cabinet is ever damaged, you can't get it out without pulling the cabinet. And a manufacturer is unlikely to cover a floating floor that was pinned, so check the written install instructions for your product.

Base cabinets first, finishing gables after

When the floor is floating, the cleanest way to do it is to coordinate with the cabinet installer:

  1. The cabinet installer sets the base cabinets on the subfloor.
  2. We install the floor up to the cabinet bases, leaving the expansion gap.
  3. The cabinet installer adds the finishing gables, end panels and toe kicks after the floor is down.

Done in that order, the gables and toe kicks sit on top of the new floor and hide the gap, so you get a clean finished look without trapping the floor. If the gables go in before the floor, the floor has to be cut tight to them and the gap is harder to hide.

Why kitchens are the most critical area

If there's one room where flatness really matters, it's the kitchen. Two reasons:

  • Weight magnifies problems. A full fridge and a run of loaded cabinets put a lot of weight on a small area. On a floating floor, any hump or dip under that weight gets worse. The floor flexes, the joints work, and that's where clicking and separating start.
  • Cabinets need a flat base. A cabinet run set on a wavy floor ends up shimmed, uneven or rocking, and the counter has to follow it.

So we check the kitchen subfloor with a straight edge and fix it before the cabinets go in. More on that in floor flatness and levelling.

Tap to compare

Floor under the cabinets or around them?

Tap to see why base cabinets go in before a floating floor.

✕ Fails over time✓ Built to lastfloor pinned in placefloor floats freetoe kick covers the gap

The cabinets pin the floating floor in place. It can't move, so gaps and peaks show up out in the room.Base cabinets sit on the subfloor. The floor floats up to them, and the finishing gables and toe kicks go on after.

Cabinets first

Do it right
  1. The floor can move the way it's meant to
  2. No gaps or peaks across the room
  3. The floor can be fixed later without touching the cabinets
  4. Keeps the flooring warranty valid

Floor under cabinets

Skip it
  1. The floor is pinned under the weight
  2. Gaps and peaks out in the room
  3. A floor repair means pulling cabinets
  4. Most flooring makers say not to, so the warranty is at risk

Floors under or around cabinets?

FloorUsual approach
Floating vinyl / laminateAround the base cabinets, never under them. Gables and toe kicks hide the gap.
Glue-down vinylEither way, depending on heights
Nail-down hardwoodOften before cabinets, or around them
TileEither way, coordinated through our trusted trade partners. Plan heights.

Watch the appliance openings

Watch the dishwasher and fridge openings. If the floor goes in around the cabinets, the new floor plus underlay raises the floor in front of the dishwasher. That can trap a dishwasher under the counter, or leave a fridge too tall for the space under the upper cabinets. We check those heights before we start, not after.

Where paint fits in

Paint before floors whenever you can. Primer and first coats go on walls and ceilings first, then the floor, then baseboards, then final touch-ups. Paint drips are much easier to deal with on a bare subfloor than on a new floor. If you need painting done as part of the job, we coordinate it through trusted trade partners.

Common questions

Should flooring go in before or after cabinets?

With a floating floor, the base cabinets go in first, then the floor, then the finishing gables and toe kicks. Cabinets should never sit on top of a floating floor. Nail-down hardwood and glue-down floors can go before or after, depending on the plan and heights.

Can you install kitchen cabinets on top of vinyl plank or laminate?

Not on a floating floor. The cabinets pin it, so it can't expand and contract, which can cause peaking or separating elsewhere. Check the manufacturer's written instructions for your product, since they decide warranty coverage.

What are finishing gables and why do they go in after the floor?

They're the finished end panels on a cabinet run. Installing them after the floor lets them sit on top of it and cover the expansion gap, so the floor stays free to move and still looks finished.

Should I paint before or after installing new floors?

Usually paint first, then install floors, then do baseboards and final touch-ups. Paint drips are easier to deal with than protecting a new floor.

Why does the kitchen floor need to be flatter than other rooms?

The spec is the same, but kitchens carry the most weight. A fridge and loaded cabinets on a floating floor magnify any hump or dip, which is where clicking and separating joints tend to start.

Who's writing this: Rose and Thorn Flooring is a flooring company in Surrey, BC. We install floors for a living, so yes, we'd love to do yours. But nobody pays us to say nice things about a product, and we don't earn commission from any brand. If something here is wrong or out of date, text us at 604-716-4160 and we'll fix it.

Free, no pressure

Send us your room. Get an honest opinion.

Not sure what floor works with your cabinets, your stairs or your dog? Send a few photos. Brody will look at them and text you back with what he'd do, why, and what it should roughly cost. No sales pitch.

Good photos: the whole room from the doorway, your cabinets, a close-up of the current floor, and anywhere it meets stairs, tile or carpet.

Or leave your details and we'll text you to ask for photos:

We only use your details to reply about your floor. No mailing list.