- Start on an outside wall. They're usually the squarest.
- Assemble about four rows loose, slide them into place, then scribe to any wall humps.
- Leave about 1/4" expansion gap, more (toward 1/2") on long runs and with laminate.
- Never press baseboards down onto the floor. It kills expansion and voids warranties.
- Undercut door jambs fully, and use an oscillating multi-tool, not an undercut saw.
- Scribe the last row with a full-width scrap board, and always leave the line.
The instructions in the box cover the basics: how the click works, the gap, the stagger. What they don't cover is the stuff installers learn on the job. These are the tricks our crew uses every day on click vinyl plank and laminate. Your product's written instructions still come first, especially for warranty specifics. And before you click a single board, make sure the floor is flat. See floor flatness and levelling.
Where to start: an outside wall
Start your first row on an outside wall. Those are usually the squarest walls in the house. Interior walls are more likely to wander, and if your first row follows a crooked wall, every row after it does too.
Build four rows loose, then slide them in
Don't fight the first row against the wall. Assemble about four rows loose in the open part of the room, where you can click them together easily. Then slide that whole block into place against your spacers.
Four rows together are stiff enough to stay straight. Now look at the wall. If it has humps, scribe the first row to them with a spacer, so the floor runs straight and the gap stays even, instead of bending the floor to follow the wall.
Expansion gaps
- Standard gap is about 1/4" at every wall and fixed object.
- On long runs (think 40 ft), increase it toward 1/2", especially with laminate, which moves more.
- Check your product's instructions. Some list exact gaps and maximum run lengths before a transition is needed.
Never press baseboards down onto the floor
This is one of the most common DIY mistakes. When the baseboard goes back on, it's tempting to push it down tight to the floor to close every gap. Don't. It pins the floor, kills the expansion gap and voids warranties.
Where the floor has low spots and you see a gap under the baseboard, scribe the baseboard to follow the floor instead. More in the baseboards and trim guide.
A joint that won't close? Check for debris
If a joint won't close, don't hammer it harder. Check for debris in the joint first. A crumb of drywall, a splinter or a grain of grit in the locking profile is enough to hold it open. Pull the board, clean the edge, and try again. Forcing it can crack the locking profile.
Door jambs: the part most DIYers get wrong
Undercut fully. The floor needs to slide under the door casing and jamb, not butt up against it. Cut the jamb and the drywall about 1/2" past the jamb, so the floor still has expansion room under there.
Use an oscillating multi-tool with a carbide blade rather than an undercut saw. Undercut saws have cost installers fingers. A multi-tool is slower but much easier to control. We prefer a Diablo carbide blade. It's thicker than a standard blade, so it leaves a little extra clearance. Lay a scrap of flooring (with underlay, if you're using one) on the subfloor and rest the blade on it to set the height.
Getting a board under a jamb. Often you can't angle a click board in under a jamb. The trick:
- Cut off only the locking nub on the female (groove) side, about 6 to 8 inches each side of the jamb. Don't cut off more tongue than you need. Click joints flex and stay strongest with as much of the profile left as possible.
- Slide the board in flat under the jamb.
- Glue that section, since the lock is gone. Use vinyl glue for vinyl plank and wood glue for laminate.
- If the edges have a wax finish, sand it off first. No glue bonds to wax. After sanding, a two-part CA glue works well.
Cut square. Where the board notches around the jamb, cut it square, about halfway into the jamb, rather than trying to follow a curved shape. Square cuts are cleaner, easier to get right and hide better.
Scribing the last row with a full-width scrap
This is the most valuable trick on the page. Walls are never straight, so scribe every final-wall cut. Here's how, step by step:
- Lay the board you're cutting on top of the last row you installed. Line it up exactly with that row, edge to edge, with its tongue pointing toward the wall the same way it'll go in. This is your "marking board."
- Grab a full-width scrap of the same flooring, tongue still on.
- Hold the scrap flat on top of the marking board, with one edge pressed against the wall.
- Run your pencil along the other edge of the scrap, sliding the scrap along the wall as you go. The line you draw copies every bump and wave in the wall.
- Cut on the line (leave the line, more below) and keep the piece on the side away from the wall. Click it into the last row.
Why it works: the scrap measures a full board width, tongue included, and a full board would bring you tight to the wall. But the cut board loses its tongue when you cut it. So the scrap's tongue width becomes your gap, because that's what gets taken off.
Changing the gap:
- Tight fit (for example against a tub): remove the tongue from the scrap first.
- Running under a wall or trim: trim the scrap further. Take off the tongue plus 1/4" to run 1/4" under.
- Shifting the marking board back and forth on the last row also changes the reveal.
It feels backwards the first time. Do a test on a short piece. Once it clicks in your head, you can adjust it for almost any situation.
Use scrap as your tape measure
Around door jambs and odd corners, a tape measure invites mistakes. Instead, use a scrap board as a physical measure: hold it in place, mark the points right on it, then transfer them to the board you're cutting. Fewer numbers to remember, fewer numbers to get wrong.
Always leave the line
Cut so the pencil line stays on the piece you keep. You can always take a little more off. You can't put it back. And keep your methods consistent. If you always mark and cut the same way, a mistake is easy to trace when something doesn't fit.
Quick checklist
| Step | Trick |
|---|---|
| First row | Outside wall, four rows loose, slide in, scribe the humps |
| Gaps | About 1/4", toward 1/2" on long runs and laminate |
| Stuck joint | Check for debris before forcing it |
| Door jambs | Undercut fully plus 1/2" of drywall, multi-tool with carbide blade |
| Under the jamb | Cut only the locking nub 6–8" each side, glue it, cut square |
| Last row | Scribe with a full-width scrap, leave the line |
| Baseboards | Never pressed down onto the floor. Scribe them instead. |
Stuck? Book a DIY video call
Doing it yourself and want a second set of eyes? We offer a 30-minute video call with Brody for $75 (FaceTime, WhatsApp or Google Meet). Show us the room, the product and the problem, and get the tips and tricks that aren't in the manual. Book at /video-call or text 604-716-4160.
If you'd rather hand it off, see DIY vs professional install.
Common questions
Which wall should I start laying vinyl plank or laminate from?
Start on an outside wall, since those are usually the squarest. Assemble about four rows loose, slide them into place, then scribe the first row to any humps in the wall.
How big should the expansion gap be for a floating floor?
About 1/4 inch is standard. On long runs, around 40 feet, go toward 1/2 inch, especially with laminate. Your product's written instructions take priority.
Can I push baseboards down tight to my new floor?
No. Pressing baseboards down pins the floor, kills the expansion gap and can void the warranty. Scribe the baseboard to follow low spots instead.
How do I get vinyl plank under a door jamb?
Undercut the jamb and about 1/2 inch of drywall past it. Then cut off only the locking nub on the groove side, about 6 to 8 inches each side of the jamb, slide the board in flat and glue that section.
What's the safest tool for undercutting door jambs?
An oscillating multi-tool with a carbide blade. Undercut saws have cost installers fingers. A thicker carbide blade also leaves a little extra clearance.
How do you scribe the last row of flooring to a crooked wall?
Lay the board to be cut on top of the last installed row, lined up with it. Hold a full-width scrap against the wall on top of it and trace along the scrap's far edge. Cut on the line. The scrap's tongue width becomes your expansion gap.
Why won't my click flooring joint close?
Check for debris in the joint first. A small crumb in the locking profile can hold it open. Clean it and try again rather than forcing it.
Who's writing this: Rose and Thorn Flooring is a flooring company in Surrey, BC. We install floors for a living, so yes, we'd love to do yours. But nobody pays us to say nice things about a product, and we don't earn commission from any brand. If something here is wrong or out of date, text us at 604-716-4160 and we'll fix it.