- Stores may push the products with the best commission. Talk to your installer before you choose.
- Big-box installs are usually subcontracted. That often means low pay per job, friction over upcharges, skipped spot levelling, short warranties, and repairs done by a different crew.
- Installers rarely stop a job over a bad product, because a stoppage costs roughly $1,000 a day.
- Every repair leaves a floor weaker. Getting it right the first time matters.
- Before install, lay out about 10 boards from different boxes and compare the sheen. And be there at the start.
This isn't a hit piece on any store. Lots of good floors get sold and installed through big retailers, and lots of good installers work as subcontractors. But the way the industry is set up creates some pressures most homeowners never hear about. Knowing how it usually works helps you ask better questions, whoever you hire.
How product recommendations usually work
The person selling you flooring is often paid partly on what they sell. That doesn't make them dishonest. It does mean the product put in front of you may be the one with the best commission, not necessarily the best fit for your house.
The best product depends on the situation, and it changes constantly. Lines get reformulated, suppliers change, and bad batches happen. The person who sees how floors actually perform over years is the installer.
Our advice: talk to your installer before you choose a product. Ask what they've seen go wrong with it, and what they'd put in their own house for your rooms. More in how to shop for flooring.
How big-box installs usually work
When you buy installation through a large retailer, the store usually doesn't send its own employees. The job goes to a subcontractor. Here's what that often looks like in practice:
| What usually happens | Why it matters to you |
|---|---|
| Low pay per job for the installer | The pressure is to finish fast and move to the next job |
| Friction over upcharges | Anything outside the standard package becomes an extra, often discovered on install day |
| Spot levelling skipped | It takes time that isn't paid well. Skipped levelling is behind a lot of clicking and separating floors. |
| Short workmanship warranties | Problems that show up after a season or two may not be covered |
| Repairs by a different crew | The people fixing it didn't install it and don't know what was done |
None of this is guaranteed. Some subcontract crews are excellent. It's just how it usually works, so it's worth asking.
Why installers rarely stop a job over a bad product
Here's something most people don't know. If an installer opens the boxes and doesn't like what they see, or thinks the product is wrong for the room, stopping the job is expensive. A stoppage costs roughly $1,000 a day in lost work for a crew.
So the pressure is to keep going, and installers rarely stop. That's exactly why the product decision needs to be right before install day, and why you should check the product yourself.
Every repair leaves a floor weaker
A floor that's pulled up and put back is never quite as strong as one that was done right. Click joints get worked, boards get replaced from a different box, and glued sections get disturbed. One repair is usually fine. Repeated repairs, often by different crews, add up.
That's why we think it's worth hiring an installer whose name is on the line, who does it right the first time, and who comes back themselves if anything needs attention. Our installs carry a 10-year workmanship guarantee. Product warranty specifics always come from the manufacturer's written instructions and warranty. More in flooring warranties explained.
Check the batch yourself: the 10-board test
Bad batches happen, and suppliers may still sell them. Before the install starts:
- Open several boxes, not just one.
- Lay out about 10 boards from different boxes side by side in good light.
- Compare the sheen. Look for boards that are glossier or duller than the rest.
- Look closely at the board edges. Sheen differences often show up there first.
- Check that every box is from the same lot.
If something looks off, raise it before a single board goes down. Once it's installed, it's much harder to sort out.
Be there at the start
Whoever installs your floor, be there at the start of the install. Confirm:
- The colour is the one you picked.
- The plank direction.
- Where the transitions go, and how doorways will be handled.
And ask the installer directly how it's going in. A good installer will happily walk you through it.
Questions to ask whoever you hire
- Who actually does the install? Your own crew, or a subcontractor?
- Will you check the floor flatness with a straight edge, and is spot levelling included?
- What would you put in my house, and is there anything you'd avoid?
- What's your workmanship warranty, and how long does it last?
- If something goes wrong, who comes back to fix it? The same crew?
- What's not included that might come up on install day?
- Can I check the boxes before you start?
For warning signs after the fact, see signs of a bad flooring install.
Already bought flooring from a big-box store? That's fine. We install customer-supplied flooring. Send us the product name and we'll tell you honestly what we think of it.
Common questions
Is it better to buy flooring installation from a big-box store or an independent installer?
It depends on the crew. Big-box installs are usually subcontracted, which often means low pay per job, upcharge friction, skipped spot levelling, short warranties and repairs by a different crew. Ask who installs, what's included and who comes back if there's a problem.
Do flooring stores push certain products?
Sometimes. Salespeople may be paid partly on commission, so the product they recommend isn't always the best fit for your home. Talk to your installer before choosing.
Why didn't my installer stop the job when the flooring looked wrong?
Stopping a job costs a crew roughly $1,000 a day, so installers rarely stop over a product issue. That's why it pays to check the boxes yourself before install day.
How do I check flooring for a bad batch?
Lay out about 10 boards from different boxes and compare the sheen, including around the board edges. Make sure all the boxes are from the same lot. Raise any differences before installation starts.
Should I be home when my floor is installed?
Be there at least at the start, to confirm the colour and plank direction and ask the installer how it's going in.
Who's writing this: Rose and Thorn Flooring is a flooring company in Surrey, BC. We install floors for a living, so yes, we'd love to do yours. But nobody pays us to say nice things about a product, and we don't earn commission from any brand. If something here is wrong or out of date, text us at 604-716-4160 and we'll fix it.